Name of the Project : Construction of Kolkata Police Training Academy near Kamardanga STP Area in District of Howrah.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 71.99 Crores.
Target of Completion : 28.02.2018
View Details
Name of the Project : Construction of New Central Correctional Home at Baruipur, District-South 24 Parganas.
Scheme of the Project : State Plan.
Value of the Project : 129.09 Crores.
Target of Completion : 28.02.2018(Phase-2).
View Details
Name of the Project : Modification renovation and upgradation of Forensic Science Laboratory, West Bengal
Scheme of the Project : State Plan.
Value of the Project : 5.39 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of Regional Forensic Science Laboratory at Durgapur, West Bengal.
Scheme of the Project : State Plan.
Value of the Project : 1.92 Crores.
View Details
Name of the Project : Construction of Bidhannagar Police Line.
Scheme of the Project : State Plan.
Value of the Project : 14.56 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of 08 units L.S. Qtr. at Alipurduar.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 1.15 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of 32 units L.S. Qtr. at SAP 13th Bn. Barjora.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 4.61 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of 08 units L.S. Qtr. at SAP 4th Bn. Raigunj,District-Uttar Dinajpur.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 1.15 Crores.
View Details
Name of the Project : Construction of 16 units L.S. Qtr. at EFR 1ST BN., SALUA, District-Paschim Medinipur.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 2.30 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of 16 units L.S. Qtr. at EFR 3RD BN., Salua, District-Paschim Medinipur.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 2.30 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of 16 units L.S. Qtr. Balurghat Police Line.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 2.30 Crores.
Target of Completion : 07.04.2018.
View Details
Name of the Project : Construction of 32 units L.S. Qtr. at Arms Police Brigade, Barrackpore.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 4.61 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of 08 units L.S. Qtr. at Kalna Old PS, Burdwan.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 1.15 Crores.
Target of Completion : 30.04.2018.
View Details
Name of the Project : Construction of 08 units L.S. Qtr. at Karimpur P.S., District-Nadia.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 1.15 Crores.
Target of Completion : 15.04.2018.
View Details
Name of the Project : Construction of 16 units L.S. Qtr. Siliguri Metropolitan Police under Siliguri PC.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 2.30 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of Subsidiary Training Centre, 4th Bn KAP Campus, Salt Lake
Scheme of the Project : State Plan
Value of the Project : 4.07 Crores.
Target of Completion Date : 31.10.2020.
View Details
Name of the Project : Renovation and upgradation of Karaya Police Station & Quarters of Kolkata Police.
Scheme of the Project : Renovation 18-19
Value of the Project : 7.11 Crores.
Target of Completion Date : 31.12.2020.
View Details
Name of Project: Renovation & Upgradation of Shyambazar Traffic Guard at 115 Bidhan Sarani, Kolkata.
Scheme of the project: Renovation 18-19
Value of the project: 9588130.00 (Tendered amount)
Target date of Completion: 03.03.2020
View Details
Name of the Project : Construction of 08 units U.S. Qtr. at Alipurduar.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 1.46 Crores.
Target of Completion : 30.06.2018
View Details
Name of the Project : Construction of 08 units U.S. Qtr. at SAP 13TH, BN., Barjora.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 1.46 Crores.
Target of Completion : 28.08.2018
View Details
Name of the Project : Construction of 08 units U.S. Qtr. at Burdwan RP Line.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 1.46 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of Model Police Station Building at Deganga under the district of North 24 Parganas.
Scheme of the Project : MPF 2014-2015.
Value of the Project : 2.60 Crores.
View Details
1. Name of Project :- Construction of four storied Superintendent of Police office in Alipurduar district.
View Details
Name of the Project : Construction of 08 units L.S. Qtr. at Bankura Police Line.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 2.93 Crores.
Target of Completion : 31.07.2018.
View Details
Name of the Project : Construction of 16 units U.S. Qtr. at ARMS POLICE BRIGADE, BARRACKPORE under the district of North 24 Parganas.
Scheme of the Project : 13th Finance Commission.
Value of the Project : 2.93 Crores.
Target of Completion : 30.04.2018.
View Details
Name of the Project : Construction of different works (barrack, boundary wall, qtr. etc.) at Digha Mohona Coastal PS under the district of Purba Medinipur.
Scheme of the Project : Coastal Security Scheme.
Value of the Project : 2.47 Crores.
View Details
Name of the Project : Construction of Office-cum-barrack (Home Guard) in the District of Howrah (Rural).
Scheme of the Project : MPF Scheme 2011-12.
Value of the Project : 0.5 Crores.
View Details
Name of the Project : Construction of Office-cum-barrack (Home Guard) in the District of Cooch Behar.
Scheme of the Project : MPF Scheme 2011-12.
Value of the Project : 0.4 Crores.
Target of Completion : 31.01.2018.
View Details
Name of the Project : Construction of Office-cum-barrack (Home Guard) in the District of Hooghly.
Scheme of the Project : MPF Scheme 2011-12.
Value of the Project : 0.4 Crores.
View Details
Name of the Project : Construction of Rural PS at Jibantala.
Scheme of the Project : MPF 2010-11.
Value of the Project : 2.60 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of Home Guard Barrack at Halisahar in the District of North 24Parganas.
Scheme of the Project : MPF SAP 2013-14.
Value of the Project : 0.85 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of Home Guard Barrack at Siliguri PC.
Scheme of the Project : MPF SAP 2013-14.
Value of the Project : 0.8 Crores.
Target of Completion : 31.01.2018.
View Details
Name of the Project : Construction of Home Guard Barrack at Paschim Medinipur District.
Scheme of the Project : MPF SAP 2014-15.
Value of the Project : 0.5 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of Home Guard Barrack at Bankura District.
Scheme of the Project : MPF SAP 2014-15.
Value of the Project : 0.55 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Renovation and Up-gradation of Police Housing Estate at 4th Battalion Campus, for Kolkata Armed Police
Scheme of the Project : Renovation 18-19
Value of the Project : 27.70 Crores.
Target of Completion Date : 31.12.2020.
View Details
Name of the Project : Construction of Multi-Storied Building for Residential Accommodation of SI/ Inspector of Kolkata Police at available land at Belghoria PHE.
Scheme of the Project : MPF 2011-12.
Value of the Project : 18.51 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of Type III quarter & Type V quarters at 4B, Prince Dilwarjha Lane, Kolkata-43.
Scheme of the Project : MPF 2013-14.
Value of the Project : 5.92 Crores.
View Details
Name of the Project : Construction of Garia Traffic Guard.
Scheme of the Project : MPF 2013-14.
Value of the Project : 3.09 Crores.
Target of Completion : 11.06.2018.
View Details
Name of the Project : Construction of Survey Park PS & barrack, Purba Jadavpur Traffic Guard & barrack on the departmental land near Hiland Park, EM Bypass.
Scheme of the Project : Mpf 2013-14.
Value of the Project : 5.90 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Physical Infrastructure Development of Police Station under Kolkata Police.
Scheme of the Project : MPF 2013-14.
Value of the Project : 3.55 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of G 4 storied Recruit Training cum Barrack building at within B.T. Lines, Cossipore, Kolkata
Scheme of the Project : State Plan.
Value of the Project : 5.46 Crores.
Target of Completion : 16.09.2019.
View Details
Name of the Project : Construction of G 4 storied Subsidiary Training Centre at 4th Bn., Campus, Salt Lake.
Scheme of the Project : State Plan.
Value of the Project : 7.67 Crores.
Target of Completion : 16.09.2019.
View Details
Name of the Project : Construction of Boundary wall at Margram Police Station in the district of Birbhum
Scheme of the Project : State Action Plan 2017-2018.
Value of the Project : 0.28 Crores.
View Details
Name of the Project : Boundary by Barbed wire for GOPIMOHAN TEA ESTATE, Jaigaon, Alipurduar District.
Scheme of the Project : State Plan.
Value of the Project : 1.55 Crores.
Target of Completion : 30.06.2018.
View Details
Name of the Project : Construction of 2 nos. Three stotied barrack for CIF at Salboni in the Paschim Medinipur District.
Scheme of the Project : State Plan.
Value of the Project : 5.60 Crores.
Target of Completion : 30.06.2018.
View Details
Name of the Project : Renovation and up-gradation of Qtrs., barrack and office etc. At Asansole-Durgapur Polcie Lines.
Scheme of the Project : State Plan.
Value of the Project : 6.53 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Land Development of Asansole Police Line.
Scheme of the Project : State Plan.
Value of the Project : 0.22 Crores.
View Details
Name of the Project : District Police Administrative building, Police Lines & Residential Accommodation of Police Personnel of different rank of Purba Medinipur District.
Scheme of the Project : State Plan.
Value of the Project : 48.47 Crores.
Target of Completion : 31.01.2019.
View Details
Name of the Project : Construction of Security Gate at Mangal Pandey Uddyan, Barrackpore in the North 24 Pargans District.
Scheme of the Project : State Plan.
Value of the Project : 0.32 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project :Construction of a Model Semi-Urban Police Station at Jiaganj in the District of Murshidabad
Scheme of the Project : State Plan 2014-15.
Value of the Project : 3.13 Crores.
Target of Completion : 31.03.2018 (PS Building Hand Over on 12.09.2017).
View Details
Name of the Project :District Correctional Home at Nimtouri in the Purba Medinipur District.
Scheme of the Project : State Plan.
Value of the Project : 27.98 Crores.
Target of Completion : 30.06.2018.
View Details
Name of the Project : Construction of SP Office at Alipurduar
Scheme of the Project : State Plan.
Value of the Project : 7.64 Crores.
Target of Completion : 31.05.2018.
View Details
Name of the Project : Intercom connectivity to all floors, LAN connenctivity including fonfiguration system at Araksha Bhawan
Scheme of the Project : State Plan.
Value of the Project : 0.11 Crores.
View Details
Name of the Project : Construction of District Police Line at Alipurduar.
Scheme of the Project : State Plan.
Value of the Project : 42.27 Crores.
Target of Completion : 02.07.2018.
View Details
Name of the Project : Construction of one storied barrack at Mograhat PS under South 24 Parganas District.
Scheme of the Project : State Plan.
Value of the Project : 0.49 Crores.
Target of Completion : 15.01.2018.
View Details
Name of the Project : Construction of Jungle Mahal Safe House at Jhargram PD.
Scheme of the Project : State Plan.
Value of the Project : 2.73 Crores.
Target of Completion : 30.04.2018.
View Details
Name of the Project : Construction of a new Officers’ Mess in Swami Vivekananda State Police Academy (SVSPA), Barrackpore in the North 24 Parganas District.
Scheme of the Project : State Plan.
Value of the Project : 4.62 Crores.
Target of Completion : 30.09.2018.
View Details
Name of the Project : Construction of Traffic Headquarter, Bidhannagar.
Scheme of the Project : State Plan.
Value of the Project : 3.98 Crores.
View Details
Name of the Project : Construction of Office-cum-Residence of S.D.P.O., Khatra under Bankura District.
Scheme of the Project : State Plan.
Value of the Project : 1.44 Crores.
View Details
Name of the Project : Construction of Office-cum-Residence of S.D.P.O., Bishnupur under Bankura District.
Scheme of the Project : State Plan.
Value of the Project : 1.44 Crores.
View Details
Name of the Project : Repair and Maintenance of Digha Police Holiday Home in the Purba Medinipur District.
Scheme of the Project : State Plan.
Value of the Project : 2.42 Crores.
View Details
Name of the Project : Construction of 2 storied building in the Habra Police Station Campus.
Scheme of the Project : State Plan.
Value of the Project : 3.34 Crores.
View Details
Name of the Project : Construction of dining hall, raising of boundary wall and allied works of Araksha Bhawan.
Scheme of the Project : State Plan.
Value of the Project : 0.83 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of Specialized Indian Reserve Battalion in the district of Birbhum (SIRB).
Scheme of the Project : State Plan.
Value of the Project : 40.06 Crores.
Target of Completion : 15.05.2019.
View Details
Name of the Project : Construction of Four Storied Unit Head Quarter for Barrackpore Police Commissionerate.
Scheme of the Project : State Plan.
Value of the Project : 14.47 Crores.
View Details
Name of the Project : Renovation of entire first floor of AB for accommodation of both Traffic Office (HQ, WB and Armed Police HQ, WB).
Scheme of the Project : State Plan.
Value of the Project : 1.09 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of Head Quarter for Asansol-Durgaur Police Commissionerate.
Scheme of the Project : State Plan.
Value of the Project : 14.50 Crores.
View Details
Name of the Project :Construction of Residence for Addl. SP, Dakshin Dinajpur at Balurghat.
Scheme of the Project : State Plan.
Value of the Project : 1.45 Crores.
View Details
Name of the Project : Renovation of Quarter for Senior Officer and construction of a new sentry post cum-rest room, Internal Pathway, Gardening & Boundary wall along the quarters including sanitary plumbing and electrical works at Tollygaunge.
Scheme of the Project : State Plan.
Value of the Project : 0.62 Crores.
View Details
Name of the Project : Boundary wall (175m.) and renovation of existing boundary wall at Ketugram PS.
Scheme of the Project : State Plan.
Value of the Project : 0.21 Crores.
View Details
Name of the Project : Construction of Rural PS at Chandrapur in the district of Birbhum
Scheme of the Project : State Plan.
Value of the Project : 2.52 Crores.
Target of Completion : 31.05.2018.
View Details
Name of the Project : Repair and Maintenance of Civil and Electrical works of FSL Lab, Belgachia Road
Scheme of the Project : State Plan.
Value of the Project : 0.02 Crores.
View Details
Name of the Project : Construction of a Model Rural Police Station at Haringhata in the District of Nadia.
Scheme of the Project : State Plan 2014-15.
Value of the Project : 2.60 Crores.
View Details
Name of the Project : Construction of a Model Semi-Urban Police Station Building at Nadanghat in the District of Burdwan.
Scheme of the Project : State Plan 2014-15.
Value of the Project : 3.030 Crores.
Target of Completion : 28.02.2018.
View Details
Name of the Project : Construction of Model Police Station Building at Belda under Paschim Medinipur District
Scheme of the Project : MPF 2014-15.
Value of the Project : 3.13 Crores.
Target of Completion : 31.03.2018.
View Details
Name of the Project : Construction of 500 capasity Hostel building for Female Trainees at SVSPA, Barrackpore(Phase-I).
Scheme of the Project : MPF 2014-15.
Value of the Project : 1.05 Crores.
Target of Completion : 31.05.2018
View Details
Name of the Project : Construction of Model Urban Malda Police Station building at Malda.
Scheme of the Project : MPF 2013-14
Value of the Project : 3.13 Crores.
Completion Date : 24.04.2017(Barrack & Canteen under const).
View Details
Name of the Project : Construction of new building for Raghunathganj Police Station under the district of Murshidabad.
Scheme of the Project : MPF 2013-14.
Value of the Project : 2.60 Crores.
View Details
Name of the Project : Construction of Renovation and upgradation of the existing Hariharpara PS building, new barrack and canteen under Murshidabad District.
Scheme of the Project : MPF 2014-15.
Value of the Project : 2.56 Crores.
View Details
Name of the Project : Construction of a Rural Police Station at GOALPUKUR in the District of Uttar Dinajpur.
Scheme of the Project : State Plan 2014-15.
Value of the Project : 2.60 Crores.
View Details
Name of the Project : Construction of a Model Semi-Urban Police Station Building at NADANGHAT in the District of Burdwan
Scheme of the Project : State Plan 2014-15.
Value of the Project : 3.03 Crores.
View Details
Name of the Project : Construction of Administrative Building and
Residential Accommodation for Police Personnel for Jhargram Police
District.
Scheme Of the Project : State Plan 2015-16.
Value of the Project : Rs. 50.28 Crores.
Name of the Project : Construction of Patuli P. S. For Kolkata Police (Balance Work).
Scheme of the Project : MPF (2011-12,14-15).
Value of the Project : 2.35 Crores.
Target of Completion Date : 31.03.2020.
View Details
Name of the Project : Construction of building for setting up Rajdanga Police Station, barrack and residential quarters of SI/Sgts. on departmental land of 26 cottah at Kasba, opposite to G.D. Purba Abasan.
Scheme of the Project : MPF(2013-14, 14-15)
Value of the Project : 7.67 Crores.
Target of Completion Date : 31.12.2020.
View Details
Name of the Project : Construction of Bansdroni P. S. For Kolkata police (balance work)
Scheme of the Project : MPF 2011-12
Value of the Project : 1.92 Crores.
Target of Completion Date : 31.01.2020.
View Details
Name of Project :- Construction of Model Rural Police Station Building including Force Barrack & Canteen at Rangli Rangliat under Darjeeling District.
View Details
Name of the Project : Construction of Administrative Block, Academic and Engineering Block, Store(G 1) and 2 Nos of Barrack (Type A), for Infrastructure of Specialized Indian Reserve Battalion at Rajnagar Police Station, Birbhum. (Phase-1, Part-1)
Scheme of the Project : State Plan
Value of the Project : 18.55 Crores.
Target of Completion : 31.12.2019.
View Details
Name of the Project : Construction of Administrative Block, Academic and Engineering Block, Store(G 1) and 2 Nos of Barrack (Type A), for Infrastructure of Specialized Indian Reserve Battalion at Rajnagar Police Station, Birbhum. (Phase-1, Part-1)
Scheme of the Project : State Plan
Value of the Project :18.55 Crores.
Target of Completion : 31/12/2019
View Details
Name of the Project : Construction of Traffic Guard Building at Bamungachi TOP Compound Under Howrah Police Commissionerate.
Scheme of the Project :
Value of the Project : 1.31 Crores.
Target of Completion : 31.12.2019
Name of the Project : Construction of Specialized Indian Reserve Battalion at Rajnagar Police Staion , Birbhum [ Auditorium, Hospital, Officers Club, Canteen, Armoury, Commandant Bungalow, Deputy Commandant Bungalow, Asst. Commandant Apartment, Sub Inspector Apartment, Barrack and Allied Works under Phase-1, Part-II]
Scheme of the Project : State Plan
Value of the Project : 20.67 Crores.
Target of Completion :
Name of the Project : Construction of Traffic Guard Building at Bamungachi TOP Compound Under Howrah Police Commissionerate.
Scheme of the Project : MPF scheme
Value of the Project : 0.44 Crores.
Target of Completion : 31.01.2020
Name of the Project : Construction of Boundary wall for setting up new SDPO, Uluberia office/ Accommodation of officers and force of EF line in Howrah Rural District along with Centry post and Gate.
Scheme of the Project :
Value of the Project : 0.38 Crores.
Target of Completion : 03.03.2020
Name of the Project : Construction of Model Rural PS at Jagatballavpur under State plan
Scheme of the Project : State Plan
Value of the Project : 21.71 Crores.
Target of Completion : 31.12.2019
Name of the Project : Construction of Model Rural Police Station Building at Lokpur in the District of Birbhum
Scheme of the Project :
Value of the Project : 2.46 Crores.
Target of Completion : 07.12.2019
1. Name of Project :- Repair, Renovation and Upgradation of 04 Nos. of two storied LS Qtrs at Kalimpong PS in Kalimpong District (3rd Call).
View Details
1. Name of Project :- Repair, Renovation & Upgradation of two storied (G 2) Wireless Building at Sadar Police Station in Darjeeling (3rd Call).
View Details
1. Name of Project :- Repair, Renovation & Upgradation of residential building - Family Qtrs - A,B,C (G 3) at 10th Bn., Dabgram under Jalpaiguri District (2nd Call).
View Details
1. Name of Project :- Construction of 300 Head R.C Barrack (G 4) at SAP 12 Bn., Dabgram under Jalpaiguri District.
View Details
1. Name of Project :- Construction of three storied Academic Block (G 2) at SAP 12 Bn., Dabgram under Jalpaiguri District.
View Details
1. Name of Project :- Construction of Rural Police Station Building with Force Barrack and Canteen at Pulbazar PS of hilly areas in the district of Darjeeling.
View Details
Name of Project: Construction of building for setting up Rajdanga Police Station, barrack and residential quarters of SI/Sgts. on departmental land of 26 cottah at Kasba, opposite to G.D. Purba Abasan.
Scheme of the project: MPF 2013-'14 MPF 2014-'15
Value of the project: 76735050 (Tendered amount)
Status: ongoing
Target date of Completion: 31.12.2020
Completion Date:
View Details
Name of Project: Construction of building for setting up Rajdanga Police Station, barrack and residential quarters of SI/Sgts. on departmental land of 26 cottah at Kasba, opposite to G.D. Purba Abasan.
Scheme of the project: MPF 2013-'14 MPF 2014-'15
Value of the project: 76735050 (Tendered amount)
Status: ongoing
Target date of Completion: 31.12.2020
Completion Date:
View Details
Name of Project: Construction of Multi-Storied Buildings for Residential Quarters (Block IV,V,VI) for Sub-Inspector on the available vacant land at Belghoria PHE for Kolkata Police.
Scheme of the project: MPF 2011-'12MPF2013-'14
Value of the project: 72551100 (Tendered amount)
Status: ongoing
Target date of Completion: 31.03.2020
Completion Date:
View DetailsView Details
Construction of CI official cum residence and garrage cum barrack at krishnaganj
View Details
Construction of CI Office cum residence and garrage cum barrack at karimpur
View Details
Name of Project: Construction of Subsidiary Training Centre, 4th Bn KAP Campus, Salt Lake
Scheme of the project: State Plan
Value of the project: 53778067 (Tendered amount)
Status: ongoing
Target date of Completion: 31.10.2020
Completion Date:
View Details
Name of the Project : Construction of 8 unit L.S Quarter at Kasba SAP 4 th Battalion, Raiganj
Scheme of the Project : (13 F.C.)
Project Status : Ongoing
Value of the Project : ₹ 84,64,835.00
Target date of Completion : 31.03.2020
View Details
Name of the Project : Construction of 100 Heads Male Barrack at Islampur P.S IN Uttar Dinajpur District.
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 1,82,60,575.00
Target date of Completion :
View Details
Name of the Project : Regional /District Office and Accommodation for West Bengal Police Housing & Infrastructure Development Corporation Limited at Malda Police Line in the District of Malda.
Scheme of the Project : State Plan.
Project Status : Ongoing
Value of the Project : ₹ 88,77,586.00
Target date of Completion : 05.08.2020
View Details
Name of the Project : Construction of Subsidiary Correctional Home at Chachal -(Part-1) Construction of Jail Perimeter Wall
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 8,03,46,311.00
Target date of Completion : 30.04.2020
View Details
Name of the Project : Construction of Subsidiary Correction home at Chachal-(Part-2)
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 11,65,97,435.00
Target date of Completion: 25.08.2020
View Details
Name of the Project : Construction of Subsidiary Correctional Home at Chachal -(Part-3)-Construction of three storied Male ward ,Male & Female Staff Dormitory,L.S Quarters,Boumdary Wall,Concrete & Bituminous Road,11 KV Sub-Station etc.
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 6,62,28,842.00
Target date of Completion : 25.06.2020
View Details
Name of the Project : Repair and Renovation of 01 no Single storied Constable Barrack at Karnajhora Police Line
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project : Renovation of Lower Sub-Ordinate Quarters and falt at Malda Police Line, District Malda(2 nos. Single Storied Building- 8 flats)
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 21,70,285.00
Target date of Completion : 30.01.2019
View Details
Name of the Project : Repair, Renovation and Upgradation of Three (03) nos. single Lower Subordinate Quarters at Itahar P.S under Uttar Dinajpur District.
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 6,61,989.00
Target date of Completion : 26.12.2019
View Details
Name of the Project : Repairing and renovation of 5 Nos. Three Storied residential buildings (Type –A Barrack) at Kasba SAP 4th Bn. Raiganj, in the district of Uttar Dinajpur.
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 2,73,17,275.00
Target date of Completion : 30.06.2020
View Details
Name of the Project : Repair and renovation and upgradation of 24 nos. LS Qtrs. in Islampur PS under Uttar Dinajpur Dist.
Scheme of the Project :
Project Status : Ongoing
Value of the Project : 58,92,561.00
Target date of Completion : 28.02.2020
View Details
Name of the Project : Repair, Renovation,Upgradation of 01 (one) no. (G 1) Storied DIB Office Building at Karnojora Police Line under Uttar Dinajpur District.
Scheme of the Project :
Project Status : Ongoing
Value of the Project : ₹ 5,40,109.00
Target date of Completion : 26.12.2019
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of Project: Construction of Subsidiary Training Centre, 4th Bn KAP Campus, Salt Lake
Scheme of the project: State Plan
Value of the project: 53778067 (Tendered amount)
Status: ongoing
Target date of Completion: 31.10.2020
Completion Date:
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details
Name of the Project :
Scheme of the Project :
Project Status : Ongoing
Value of the Project :
Target date of Completion :
View Details